, ,

,

on the evening of August 18, the flood in Leshan, Sichuan began to subside gradually. On the morning of the 19th, the Red Star News reporter saw in Leshan city that the water in most sections of the road had receded and the traffic basically returned to normal. Many citizens had already started dredging voluntarily.

,

,

,

} citizens began dredging in the early morning.

according to the traffic police detachment of Leshan City, the water on the roads in the central urban area of Leshan has basically subsided. Traffic control is still in place for the second Minjiang Bridge underpass tunnel and the Raffles underpass tunnel, and other main roads have been restored to traffic.

,

,

,

↑ traffic was basically restored.

and

in addition, after the first, second and third bridges of Minjiang River were opened to traffic, there was a lot of silt in some sections, and the sanitation workers were cleaning up, which had a certain impact on vehicle traffic. Affected by the power failure, there are 25 intersections in the central urban area whose signal lights have not been restored. Please obey the traffic police’s command.

,

, ,

,

at about 8:00 am on the 19th, the Red Star News reporter saw that the shops and communities along the street were greatly affected by the flood, and there was a lot of mud on the street. Many citizens began to clear the mud in front of the door. The desilting vehicles arranged by local government departments have also been in place, and the dredging and killing work will be carried out in succession.

,

,

,

↑ there is a lot of silt on the riverside road.

,

,

,

↑ dredging machinery operation.

Red Star News reporter Gu aigang and Jiang Lin photographed and reported

original title: the red star hit directly, the flood subsided, the traffic in Leshan city basically returned to normal, and the citizens began to clear the